CITY OF SWISHER

Building Permit Application

 

Applicant Information:

 

 

Applicant Name                                                                                                                                   Date

 


Applicant Address                                            City                              State                Zip                   Phone #

 

Site Information:   (site address, legal description and present zoning)

____________________________________________________________________________________________________________________________________________________________________________________

 

Set Backs:     (Please Provide Measurements in feet)

 

__________ Front Yard      __________ Right Side        __________ Left Side         __________ Rear

 

Description of Work:   (i.e. new construction, remodeling, addition, etc.)

 

 

 


____ Residential           ____ Commercial         ____ Industrial ____ Garage                ____ Out building

 

____ Deck/Porch         ____ Other, specify  ______________________________________________________

 

Type of Construction:

 

____ Wood Frame       ____ Masonry              ____ Steel                    ____ Pole Building       ____ Other

 

Type of Footing             ____ Masonry             ____ Concrete             Footing width/depth ___________________

 

Structure Dimensions:

 

Lot Size (width/length) ______________         Structure Size (width/length) ______________________________

 

Number of Bathrooms  ______________        Basement, Yes/No and Size   ______________________________

 

Number of Stories        ______________        Overall Height (35 feet maximum for residential) _____________

 

*Estimated Cost             ______________

 

Construction Timeline:

 

Estimated starting date _______________                                           Estimated finish date __________________

 

(Zoning Ordinance 1.05.02 dictates that work must begin within one year of the issuance of this permit and will expire 2 years after issuance.)    

 

Building Permit Application (continued)

 

Plat and Setback Information:

 

A plat, drawn to scale, must accompany this application.  The drawing need not be of professional quality, but neatness and accuracy are encouraged.  The following items are REQUIRED to be shown on the drawing before the permit will be granted:

1.      All property lines of parcel that will be built on.

2.      Location of proposed structure in relation to all property lines.

3.      Location of all existing buildings.

4.      Parking and driveway access.

5.      Location of proposed sidewalks, if applicable.

6.      Centerline of all adjacent city streets.

7.      Label street names bordering property

8.      Location of sewer connection to city sewer. (proposed or existing)

9.      North arrow.

 

Miscellaneous Information:

 

·        Blueprint required for all new construction.

 

·        The accuracy of all lot lines and dimensions shown on this permit application are the sole responsibility of the applicant.  The city will issue the permit based on the information provided by the applicant.  If this information proves, at any point, to be inaccurate, the property owner may be required to alter the structure to bring it into compliance with city ordinances.  The City of Swisher strongly urges applicants have the proposed projects surveyed by a professional surveyor to insure compliance.

 

·        Dumpster required for all construction debris and keep site clean.  (Please no burning on job site)

 

·        Building permit applications and $25 fee must be returned to the City Hall.

 

·        It is the responsibility of the applicant to determine if sub-division covenants may affect this project.

 

·        Fees are set by resolution by the city council. 

 

·         

I hereby certify that I have read and examined this application and know the same to be true and correct.  All provisions of laws and ordinances governing the proposed type of work will be complied with whether specified herein or not.  The granting of a permit does not relieve the permit holder of obligations to complete the construction in accordance with local building and zoning codes.

 

___________________________________                                           _________________________________

Applicant Signature                                                                                    Signature of Mayor

 

Approved/Denied:        _________________                                           _________________________________

                                    Date                                                                      Date

                                   

Application Fee Pd. _____________                           Building Permit Fee Paid __________________

                                  Amount / Date                                                                         Amount / Date